Showing posts with label Benjamin Banneker Memorial. Show all posts
Showing posts with label Benjamin Banneker Memorial. Show all posts

Wednesday, November 3, 2010

A Few Quick Items

-The Washington City Paper profiles the trials and tribulations behind the decades-long effort to bring a memorial for Benjamin Banneker to Banneker Overlook near L'Enfant Plaza. The latest setback was the rejection by ANC 6D last month to add "Banneker Park" to the L'Enfant Plaza Metro station name.

- Speaking of L'Enfant Plaza, the owner of one of the office buildings is suing majority owner JBG, according to the Washington Business Journal (subscribers only) over plans to build an office building in the middle of the plaza.

- According to the Washington Examiner, authorities are investigating the fatal fire earlier this week at Greenleaf Seniors building on Delaware Avenue that claimed the life of 63-year old Anita Lakari.

Sunday, October 17, 2010

New Condo Project in the Works?

On the agenda for Monday's ANC 6D meeting is a new residential project called Marina Place. According to CondoAuthority.com, Marina Place is a planned condo building located in Buzzard Point at 95 V Street. Currently, the site is a vacant lot and is bounded by V Street, 1st Street, Half Street, and the Buzzard Point Marina. There will be a hearing with the Zoning Commission on Thursday, November 4th. The CondoAuthority.com website describes the project as:

A new condominium building with a modern design featuring angular glass walls. The site offers 345 feet of uninterrupted views of the Anacostia River and is located about 5 blocks southwest of Nationals Park. Developed by Buzzard Point LLC the project will contain 4,800 square feet of retail space. (Above is a view of the Buzzard Point Marina.)

During the condo boom in 2005, Walnut Street Development planned to purchase the same site from Duane R. Deason and build a 90-unit condo project, but those plans fell through and the condos were never built. Next door to Marina Place is the headquarters of the U.S. Coast Guard, who has a new headquarters building under construction at St. Elizabeths in Southeast. Across the street is the Buzzard Point Plant, which the American Planning Association's Planning Assistance Team (PAT) recommends becoming a future museum or gallery when it is decommissioned. Also in the vicinity is 100 V Street, a massive office complex planned by Akridge.

Other items on Monday's agenda include the temporary street closing of 6th Street for Saturday's Homecoming celebration at Arena Stage, the permanent closure of Water Street to make way for the redevelopment of the Southwest Waterfront, and a request to add Banneker Memorial to the L'Enfant Plaza Metro name.

Saturday, December 19, 2009

Renovations Underway at L'Enfant Plaza's Retail Promenade

In early November, the JBG Companies, owner of the retail promenade at L’Enfant Plaza, began a $40 million renovation and expansion effort designed by SmithGroup, a national architecture firm. Billed as the only major retail shopping center in Southwest Washington, the retail promenade’s modernization is well overdue. Recently, I took a stroll along the retail promenade and with the gold-looking metal frame around the storefronts, Broadway-style marquee lighting, and 80’s music pumping through the sound system, I felt like I went through a time warp. Above is a photo of a typical storefront at the promenade, which looks very dated.

The retail promenade is located below grade at the center of L’Enfant Plaza, a 1960s-era mixed-use complex that was designed in the Brutalist architectural style, with some of the buildings designed by renowned architect I.M. Pei. It connects to three existing office buildings and the L’Enfant Plaza Hotel. A glass pyramid was built more recently in the center plaza and provides the only source of natural light to the shopping center below. Current tenants include Dress Barn, CVS, Radio Shack, PNC Bank, and Au Bon Pain, along with fast food restaurants, a florist, and other convenience retailers. Some retailers on the eastern side of the promenade were relocated to the west side so improvements could begin first on the side closest to the Metro entrance. Above is a view of the north office building from the glass pyramid inside the retail promenade.

Once phase one is completed in the first quarter of 2011, a food court will be located near the Metro entrance with windows facing the neighboring HUD building, along with outdoor seating for restaurant patrons. At full built-out, the retail center will be 205,000 square feet and will complement the modernist architecture of L’Enfant Plaza with a clean, slick design. A large sculptural glass entryway will replace the pyramid to bring some natural light and visual interest into the underground shopping center. Other restaurants will be located under the glass entryway and storefronts will be scattered throughout the retail promenade. Above is a rendering of the glass entryway, courtesy of JBG. The renovation of the retail promenade is part of the overall revamping of L’Enfant Plaza, which will include the renovation of the north and south tower office buildings, as well as the 370-key L’Enfant Plaza Hotel. The west tower office building, home to the United States Postal Service, is not owned by JBG, and is not part of the renovation schedule. Two new office buildings will be constructed in the center plaza area, an extended-stay hotel will be located in the northeast parcel, and apartments will be built on the southeast parcel. Below are a couple more renderings.

(Left) Here is a rendering of the sculptural glass entryway.





(Right) This is a rendering of the food court, which is a part of phase one of construction.

Apart from the L’Enfant Plaza complex, but along 10th Street, the Washington Interdependence Council plans to build a memorial to Benjamin Banneker, an astronomer and mathematician who helped Pierre L’Enfant plan the city of Washington. Included with the memorial will be the Banneker Institute of Math & Science and a Founding Fathers Walk. In addition, the Monumental Core Framework Plan, released earlier this year by the National Capital Planning Commission and the US Commission of Fine Arts, calls for the redevelopment of the 10th Street corridor as a gateway between the National Mall and the Southwest Waterfront. Construction timetables have not been set for the renovations and new buildings along 10th Street, but once everything is complete, L’Enfant Plaza and its environs will be unrecognizable.