Monday, April 25, 2016

D.C. United Stadium Demolition Ceremony


An official demolition ceremony was held this morning at the site of the future D.C. United Stadium in Buzzard Point. Speakers at the event included Mayor Muriel Bowser, DC Council Chair Phil Mendelson, Ward 6 Council Member Charles Allen, D.C. United owner Jason Levien and others. Deputy Mayor for Planning and Economic Development Brian Kenner stated during his remarks that the stadium project will provide 1,000 construction and permanent jobs, as well as help generate $1 billion in economic activity once Buzzard Point reaches buildout. It’s anticipated that approximately 1 million visitors will come to the stadium per year once it is built – construction will get underway this fall with completion by the start of the 2018 MLS season. This summer, a Community Workforce Coordinator will be hired to help connect Ward 6 residents to construction jobs at this project. Later, a Hospitality and Pre-Apprenticeship Coordinators will also be hired.

Ward 6 CM Allen gives remarks.
Mayor Bowser gives remarks.

A large crowd gathers for demo event.









The 96'ers were in attendance.












I couldn't get to the front row fast enough for the obligatory photo-op.

The District is responsible for horizontal development of the site, including razing existing buildings, utility work, and environmental remediation while D.C. United will build the stadium. There were a few protesters outside of the demolition event, many in face masks, with signs – one sign said “Protect out health, our children, our lives from contamination.” The Buzzard Point area is heavily polluted due to its primarily industrial past. The stadium, along with construction from the new Waterfront Pepco substation directly north of the stadium site, the new Frederick Douglass Memorial Bridge, and other sites in Buzzard Point which may be developed in the near future, will require extensive remediation and may cause a lot of dust to form in the neighborhood. In fact, there was what appeared to be an air quality control machine at the event.

Protesters citing environmental issues.
Air quality control machine.











After the speeches, the Mayor donned a hard hat and started demolishing a metal-clad building at 2nd and S streets. Below is a video of Mayor Bowser doing some demo work. Levien and Allen also got their turn at the helm.


Sunday, April 24, 2016

Wharf Update


The Wharf is buzzing with construction activity, as structural steel framing for the new Wharf Hall at Parcel 2 is out of the ground and pillars for the apartment building there are now above ground. Meanwhile, the apartment building at Parcel 4A has now reached the fourth floor and VIO condos (Parcel 4B) is not far behind.


It was announced in Globest.com that Hoffman Madison Waterfront received construction financing for the dual Canopy by Hilton/Hyatt House hotel project on Parcel 5 adjacent to 7th Street Park. 

Starting next month, 7th Street at Maine Avenue will be closed to vehicular traffic so work can get started at 7th Street Park. Also in May, traffic will reopen on Water Street and M Place around the new 525 Water condo building and St. Augustine’s Church, the former of which looks almost complete.












Utility work continues at the new Waterfront Park adjacent to 525 Water condos. Construction on the park is expected to be complete late this year.












Work on extending the commercial Pier 4 continues. Look here for more information on what’s planned at the new Pier 4. A pair of construction cameras have been set up so you can keep track of what’s going on at The Wharf. 525 Water/St. Augustine's should open in 2016 while the rest of phase one should be complete by the fall of 2017. 

Thursday, April 21, 2016

SWBID to Move to New Digs


SWBID will soon be moving from their temporary quarters at Arena Stage to the ground floor of Patriots Plaza on 4th Street, across the street from the CFL. The BID has begun ramping up operations since it was formed last year. One of the most visible signs has been the "Clean Team", which can be seen sprucing up the area. Also, new outdoor furniture was installed in the SW lot of Waterfront Station at 4th and M streets, where AYA Markets will return later this spring for their weekly Saturday morning farmers market. The monthly Market SW night market will also be back on the fourth Friday of each month starting on May 27 through October 28. Vendors who are interested in participating can find an application here. Another activation space within the BID will be located at Maryland Avenue and 7th Street, where food trucks gather during lunchtime to feed the thousands of Federal employees who work in the area.

Demolition Ceremony for D.C. United Stadium on Monday


A demolition ceremony to make way for the new (tentatively named) D.C. United Stadium will be held on Monday, starting at 11am. Mayor Muriel Bowser, D.C. United representatives, and other dignitaries will be on hand for the demolition ceremony, to be held at 2nd and S streets in the stadium footprint. The District took ownership of the land for the stadium last year and is still dealing with eminent domain proceedings for a two-acre portion that was owned by Akridge. A PUD for the 20,000-seat stadium designed by Populous was filed in January and is making its way through the approvals process with the Zoning Commission. 

 At a Zoning Commission pubic meeting last month, the stadium design was described as “boring”, “austere” and “prison-like” by the Commissioners, so expect some revised drawings in the coming weeks. Once approvals have been secured and environmental remediation is complete, construction is expected to start around September with the stadium opening in time for the start of the 2018 MLS season in March. 

Rendering courtesy of D.C. United

Tuesday, April 19, 2016

Construction Activity at St. Matthew’s Site


Construction equipment has finally arrived on site at Delaware Avenue and M Street, which will be transformed into a new sanctuary for St. Matthew’s Lutheran Church and a 221-unit apartment building. The sanctuary will be at the corner of Delaware Avenue and M Street and the 11-story apartment building will run along M Street. Chain link fencing has been up around the site for years, but in the past few days, a construction trailer arrived along with backhoes, and Delaware Avenue was closed on Monday as construction crews started digging in the street. Parking restrictions on both sides of Delaware Avenue are expected for the next two months as utility work is done for the project, but restrictions on the west side of the street will last longer since it will take about two years to finish construction.












The St. Matthew’s project is a long time coming – the PUD was approved in November 2012 and a two-year extension was requested in late 2014. This is the second rental apartment building to start construction over the past couple of months in the quadrant. Construction began last month at 301 M Street, located cattycorner from the St. Matthew’s site. Within the next few months, two more apartment buildings will get underway. Construction on two new rental apartment buildings on the parking lots of the View at Waterfront apartments on 6th and M streets and 6th and K streets should get started this summer (a new name for this project will be announced soon). 

Rendering courtesy of Shalom Baranes Associates

Wednesday, April 6, 2016

Randall Field Ribbon Cutting this Saturday


The new multipurpose turf field at Randall Recreation Center has a new name which may sound familiar to Nationals fans…the Ryan Zimmerman Field will officially open this Saturday with a ribbon cutting at 10am. The festivities begin at 8:30am with “fun and games” and concludes with an inaugural baseball game at 10:30am. Guests will include the aforementioned Zimmerman, Nationals manager Dusty Baker, Mayor Muriel Bowser, Ward 6 Council member Charles Allen, ANC 6D commissioners, and other dignitaries. All are welcome to attend. The field was redone this past fall and winter by a partnership between DPR/DGS, the Nationals Dream Foundation, the Cal Ripken ?Sr. Foundation, and Under Armour, which includes baseball and soccer fields.

Friday, April 1, 2016

Over 1,800 Mixed Income Units Could be Built at Greenleaf


At last Saturday’s second Greenleaf community meeting, consultants from HR&A Advisors revealed a potential redevelopment plan for Greenleaf, which calls for a phased redevelopment of the 15-acre public housing complex. The plan would rebuild the 493 units of public housing that currently exist at Greenleaf as well as another 1,374 units of market-rate housing, in a mix of 1-, 2-, 3-bedroom and townhome units. Since many of the existing Greenleaf units are townhomes, a portion of the replacement Greenleaf units will also be townhomes. 

There were six main design ideas that were followed by the consultants and planners from Perkins Eastman: 
  1. Make significant public places – Greenleaf abuts Lansburgh Park north of M Street and Greenleaf Recreation Center to the south 
  2. Build on existing and historic street network 
  3. Construct higher density first 
  4. Re-connect across M Street 
  5. Enhance connection to emerging neighborhoods: Waterfront Station, The Wharf, Capitol Riverfront, Ballpark District 
  6. Integrate market and affordable housing – 30% affordable on each redeveloped block 


The preferred redevelopment option would be to build the first phase outside the Greenleaf footprint, but in the vicinity, so Greenleaf residents won’t need to leave the community. A “Build First” model is something many in the community have advocated for and has the support of the ANC and the DC Council. Several District and federally-owned sites were identified as possible locations for building the initial phase of 127 units under the “Build First” model. This would allow the redevelopment of the block of 38 townhomes between L and M streets to proceed without displacing residents because the families in the townhome units can be moved to the new off-site building. 


The initial phase inside the Greenleaf boundaries would be a high-rise building on the north side of M Street with 271 units for seniors, with the potential for ground floor retail. Once that building is complete, the current seniors building on the south side of M would be replaced with another high-rise with 662 units of mixed income housing, including flats and townhomes on the first two levels. Phase three on-site includes 240 units – townhomes where the Greenleaf mid-rise building is now and a high-rise on the north end of the block between L and M streets. After that phase is complete, a mix of 336 mid-rise and townhome units can be built on the block between K and L streets. Development would conclude with more mid-rise and townhome units (336 units) on the northernmost block between I and K streets. 

This is just a preliminary plan and could change before the final plan is released this summer. A third community meeting will be held in May where the plan will be fleshed out further. Construction is still several years away, but having a framework will allow the Housing Authority to seek a developer partner to help bring the vision of a mixed income Greenleaf to reality.

The redevelopment plan for Greenleaf sounds very similar to one posted three years ago today on this blog...the only difference is the current plan is NOT A JOKE. The Housing Authority could have hired me to write the plan! :-)

Friday, March 25, 2016

New Standalone SW Branch Library; PN Hoffman Wins Waterfront Station Project


At this morning’s “March Madness” economic development event, DMPED and other District agencies offered several parcels across the city for development. One such parcel is located in Southwest – the Southwest Branch Library at 900 Wesley Place. The current Southwest Branch Library is a 21,600 SF building with three levels and was built in 1965. A mini-makeover was done in 2011, but funding for an extensive renovation was removed from the budget a few years ago. The library will be replaced with a standalone facility designed to achieve LEED-Silver certification.

The library’s future was hotly debated in 2014 when DMPED, OP and DCPL proposed to move the library to the city-owned NE parcel at Waterfront Station, which would have been part of a mixed use building with residential, retail, and the library. That proposal was shot down by the community in favor of keeping the library at its current location and build a new, standalone library, which the city intends to do. 

Earlier concept for a SW Branch Library on 4th Street.

As a result, DMPED released a RFP after last year’s “March Madness” event for the Waterfront Station site at 1000 4th Street without the library requirement. Several redevelopment teams responded to the RFP with three of them making the final cut last summer. While a decision was expected back in November, DMPED finally announced today that PN Hoffman’s bid was selected. 


PN Hoffman’s presentation was unique in that the amount of proposed retail space was more than double the amount proposed by the other teams and prospective retail tenants were announced. The development plan includes 443 rental apartment units, 22,500 SF of community-oriented retail, and a 10,000 SF, 200-seat black box theater, all in a LEED-Gold building designed by Torti Gallas. The 133 units of affordable housing includes 34 units at up to 30% of AMI and 99 units at up to 50% of AMI. Retail would be located on 4th Street, wrapping around to a new private drive on the north end of the site. A letter of intent has been signed by Constantine Stavropoulous, the owner of Tryst, Open City, The Diner, and The Coupe to open a diner at the corner of 4th Street and the private drive. Other retail uses such as a daycare center and artist space could be located on the north side of the development along the private drive, which serves as a connector between the Southwest Library branch and the SW Duck Pond. The private drive could be closed off at times for arts-focused events. The proposal was the preferred choice of ANC 6D, which will get to weigh in again once PN Hoffman goes through the second stage PUD process. 


The RFP for a design-build contract for the new library will be released this fall. A flyer about the project says the following: 
The new Southwest Neighborhood Library will reflect the program and goals of the library and the needs of the District of Columbia residents who use it. The building will incorporate forward-thinking approaches to urban design, architecture, engineering, and environmental technologies in the public realm. The new Southwest Library will be a destination that will attract and support hundreds of users per day, and promote a vibrant, mixed-use neighborhood and active street environment. 
According to SWBID Director Steve Moore, DCPL will receive $1 million in next year’s budget for planning the new library. There will more than likely be community involvement in that planning process. 

Renderings courtesy of DCPL and PN Hoffman

Greenleaf Redevelopment Community Meeting TOMORROW!


A second community meeting to discuss the latest on the redevelopment of Greenleaf will be held tomorrow from 11am to 2pm. The meeting will take place at the SW Family Enhancement Center at 203 N Street. DCHA is spearheading the redevelopment of Greenleaf, despite not receiving a HUD grant back in 2013. At the first community meeting in October, five design principles were laid out to guide redevelopment: 
  1. Utilize a mix of tall and low buildings. 
  2. Create a well-defined public green space. 
  3. Use trees to beautify, help make place, and create a healthier living environment. 
  4. Connect the new Greenleaf to other areas of the city. 
  5. All new construction must first and foremost be exemplary urban architecture. 
An additional community meeting will be held before the final master plan is completed around the middle of this year, with an RFP to be released later in 2016.

Thursday, March 24, 2016

1900 Half Street PUD Filed


A PUD was filed by Douglas Development for 1900 Half Street, which is currently an office building located along the Anacostia River on Buzzard Point. The building is visible as one crosses the Frederick Douglass Bridge. Douglas proposes to redevelop the nine-story structure into a multifamily building with 462 residential units and 24,032 SF of retail space. The current building is rectangular in shape, but the developer proposes to remove portions of the building to create two large open courtyards on the second floor, resulting in an “E” shaped building facing the river. The building as designed by Antunovich Associates, will be reskinned with a vision glass curtain wall, blue and white colored metal panels, and terracotta rain screens. 


Entrances to the residential lobby and retail will be along Water Street – one section of retail will be two levels. Ground floor units will have lofts and some second floor units will have private terraces facing the river. A fitness center and other amenity space will also be on the second floor while on the roof, an indoor lounge, rooftop pool deck and infinity pool will be installed, which should have great views of the river, Capitol dome and Washington Monument. Parking will be provided in the existing garage with 324 spaces accessed only from the north (the southern access point and curb cut will be removed). The building currently has 691 parking spaces and the Capitol Gateway Overlay regulations require only 182 spaces. 


Although the project won’t have a 75-foot minimum setback from the Anacostia bulkhead since the original building was completed prior to 2005, the river side of the building will have a promenade ranging from 14 to 24 feet (the larger promenade on the northern part of the site will be in two sections, divided by a 10-foot bioretention barrier). The project will seek LEED-Gold status. 


This PUD application was expected since the Office of Planning listed it as one of six major projects planned on Buzzard Point in the Buzzard Point Design Framework Plan document. 1900 Half Street is less than two blocks from the site of the new DC United soccer stadium and catty-corner from Ziegfeld's/Secrets, which was purchased by MRP Realty and will be redeveloped as a multifamily building. It’s also north of Marina Place where Capital City Real Estate plans to build about 100 condos and near the Transpoint Building, which is under contract to Redbrick. 1900 Half should be before the ANC later this year. 

Renderings courtesy of Antunovich Associates